In Australia and Britain, the building rules that matter most are set nationally or by large states. In the United States they are set by thousands of jurisdictions. Model codes are adopted and amended locally. Energy policy for existing buildings is driven largely by cities and a handful of states. The result is a patchwork, and capital planning has to start with the address.
This note reads the American setting for its capital consequences. It is not legal advice.
Cities cap existing buildings
Building performance standards limit the energy use or emissions of existing buildings, not just new ones. New York City’s Local Law 97 is the best known. It applies to most buildings over 25,000 square feet, set its first limits from 2024 and tightens them significantly from 2030, with a penalty of 268 dollars per tonne of emissions above the limit. Urban Green Council’s analysis of 2024 benchmarking data found that only 43 per cent of covered buildings already meet the 2030 limits.
Other cities and several states have adopted their own standards, including Boston, Washington DC, Denver, Colorado, Maryland and Washington State, each with its own metrics and timetables. Several have faced delays, and in 2025 Washington DC’s mayor proposed pausing implementation there. Many more cities require annual energy benchmarking and publish the results.
Where a performance standard applies, the replacement of a gas boiler is no longer just a maintenance decision. It is a compliance strategy with a penalty attached to getting it wrong.
What the first year showed
New York’s Local Law 97 reached its first compliance deadline in 2025, and the results are the first real evidence of how owners respond to a performance standard with penalties attached. Of 29,031 buildings required to report, about 7 per cent did not file. Of those that did, about 95 per cent met their emissions limits. Penalties collected so far are modest, around $270,000 from roughly fifteen buildings, against a statutory rate of $268 per tonne of carbon dioxide equivalent over the limit.
The first period was always going to be the easy one; the limits tighten sharply from 2030. What the first year shows is that most owners can meet a lenient limit with operational changes and modest works, and that the capital question arrives at the second step, when plant replacement and electrification become hard to avoid.
| Jurisdiction | Covers | Key point at review |
|---|---|---|
| New York City (LL97) | Buildings over 25,000 sq ft | First period 2024 to 2029; tighter limits from 2030; $268 per tCO2e over the limit |
| Washington State (CBPS) | Tier 1 commercial over 220,000 sq ft | First compliance deadline 1 June 2026 |
| Evanston and West Hollywood | Local building stock | Adopted standards in 2025 |
| Benchmarking only | More than 35 jurisdictions | Annual energy reporting; no performance cap |
NYC Department of Buildings via Facilities Dive; Institute for Market Transformation. About fifteen state and local governments had adopted performance standards by 2025.
Reading a building against a performance standard
A performance standard converts a building’s energy use into an emissions figure using factors for electricity, gas and steam, and compares it with a limit set by occupancy type and floor area. The reading an owner needs is therefore in four steps. Benchmark the current position from the energy data most cities already require. Model the limits for each compliance period against that position. Identify which measures close the gap, in order of cost and disruption: controls and operations, lighting, heating plant and electrification, envelope. And time those measures against plant life and lease events so that compliance is achieved by replacement at the right moment rather than by premature spend or penalty.
In the register, the same works appear as ordinary plant, controls and fabric rows. What changes is their timing field, which is set by the compliance period as well as by condition, and their cost basis, which records the penalty exposure that makes the timing matter.
The condition assessment culture
American commercial real estate has a well-established due diligence product in the property condition assessment, commonly performed to the ASTM E2018 standard and often required by lenders. It typically identifies immediate costs and projects replacement reserves over a term, frequently around ten to twelve years, alongside a separate Phase I environmental site assessment. Due Diligence Across Three Markets compares it with Australian and British practice.
Lender-driven assessments are efficient and consistent, but they are often designed around a loan rather than an owner’s strategy. A capital plan built for decisions asks different questions of the same building.
Net leases and reserves
Net leases are common, especially triple-net structures in single-tenant retail, industrial and some office assets, where tenants carry taxes, insurance and many operating costs. Even so, structural and major replacement items often remain with owners, and the line between repair and capital varies by lease.
In shared residential and mixed-use buildings, reserve studies estimate future capital needs. After the 2021 collapse at Surfside, Florida introduced mandatory milestone structural inspections and structural integrity reserve studies for condominium buildings of three or more habitable storeys, a reminder that underfunded shared buildings can become a safety issue, as discussed in Why Shared Buildings Defer.
Insurance and physical risk
The United States is where insurance retreat from physical risk is most visible, with insurers withdrawing from or repricing exposed regions. For owners, building-level resilience, plant location, roof systems, flood protection, increasingly shows up in insurance terms. Climate as Physical Risk develops this. Local standards change with local politics and litigation, and this note is reviewed every six months.
Sources
Named sources consulted for this paper. Consequential claims link to their source in the text. Reviewed 3 November 2026; next review by 3 May 2027.
- Local Law 97: greenhouse gas emissions reductions, NYC Department of Buildings. Accessed 3 November 2026.
- Local Law 97 progress, Urban Green Council, updated January 2026. Accessed 3 November 2026.
- SB 4-D bill summary (2022 special session), Florida Senate. Accessed 3 November 2026.
- Structural Integrity Reserve Studies in Florida, Rimkus, 19 June 2026. Accessed 3 November 2026.
- ENERGY STAR for buildings, US Environmental Protection Agency. Accessed 3 November 2026.
- NYC Local Law 97 2030 limits make retrofit timing urgent, Environment + Energy Leader, reporting Urban Green Council. Accessed 3 November 2026.
- HB 913 (2025) staff analysis, Florida House of Representatives. Accessed 3 November 2026.
- Rescinded, required, pending: mapping US climate disclosure rules in 2026, Jones Day, September 2026. Accessed 3 November 2026.
- Strong compliance in first year of NYC’s Local Law 97 building performance mandate, Facilities Dive (NYC Department of Buildings data). Accessed 3 November 2026.
- Building energy benchmarking and performance standards maps, Institute for Market Transformation. Accessed 3 November 2026.
- 2026 building policies outlook: local and state leadership in a federal vacuum, Institute for Market Transformation. Accessed 3 November 2026.
Questions
Which buildings does New York City’s Local Law 97 cover?
Most buildings over 25,000 square feet, with emissions limits that began in 2024 and become significantly stricter from 2030. Exemptions and alternative pathways apply to some building types.
What is a property condition assessment?
A due diligence report on a commercial property’s physical condition, commonly prepared to the ASTM E2018 standard, typically identifying immediate repair costs and projecting replacement reserves over a term, often for a lender.