Building Code Compliance: signs, causes and next steps
What does it mean when you see this, and what do you do next?
Moyne Ross
Technical Library
Updated November 19, 2026
Every sign of failure the Technical Library records under Building Code Compliance: 24 signs across 3 elements and spaces. Each row gives what you see, the likely cause and what confirms it, and the next step. Each heading opens the page the rows come from.
Scope
A sign usually has more than one possible cause. Each row names the likely one and what would confirm it; none is a diagnosis of a particular building, and none is a price.
What you see Likely cause, and what confirms it Next step Steps at the only entry Building predates access requirements. Era; approvals.Plan a ramp, platform lift or regraded path; if it cannot be done at once, set it in an access action plan. New fit-out with an accessible toilet but steps at the entry Path of travel not upgraded with the alteration. Approval documents; access report.Upgrade the path of travel as the approval requires, and check the access report's conditions. Doorways too narrow for a wheelchair on the accessible route Clear width below current standards. Clear opening measured with the door at 90 degrees, against the asset’s market (Thresholds by market ).Widen the opening or rehang the door at the next alteration. Ramp that feels steep, or a lip at its top or bottom Ramp gradient or level change outside the rules. Gradient and level change measured against the asset’s market (Thresholds by market ).Regrade the ramp or fix the lip; add handrails where required.
What you see Likely cause, and what confirms it Next step Tactile indicators lifting at stairs Adhesive failure from traffic and cleaning. Inspection.Replace the lifted indicators now; they are a trip hazard. Doors that people in wheelchairs cannot open Closer force too high or no automatic operator. Door force measurement against the asset’s market (Thresholds by market ).Adjust the closer to the required force, or fit an automatic operator.
What you see Likely cause, and what confirms it Next step Accessible toilet full of boxes Management practice. Observation.Clear it, and put a procedure in place to keep it available. No refuge or evacuation plan Egress for people with disability not addressed. Fire strategy; plans.Review the fire strategy and prepare evacuation plans for people who need assistance.
What you see Likely cause, and what confirms it Next step Drilling, cutting or demolition started without a refurbishment survey Asbestos disturbed without knowing where it is. Survey records against the work area; the HSE survey guide expects a refurbishment and demolition survey before such work (HSG264 ).Stop the work, isolate the area, survey, and decontaminate if needed. Fire or storm damage to an older building with cement sheet or lagging Asbestos debris spread by the event. Visual inspection; sampling of debris; air monitoring.Restrict access and arrange licensed clean-up before repairs. Sanding or stripping old paint Lead dust released. Paint testing before work, against the definition of lead paint for the asset’s market (Thresholds by market ).Use lead-safe methods and clean-up, and keep occupants away.
What you see Likely cause, and what confirms it Next step Cement sheet roof weathered with exposed fibres Asbestos cement weathering. Sampling; register.Sample if not already identified; plan removal or encapsulation, and keep people off the roof. Damaged lagging in a plant room Friable asbestos deteriorating. Sampling; air monitoring.Isolate the area now; licensed removal with air monitoring. Flaking paint on a pre-1970 building Possible lead paint. Paint testing.Test the paint; stabilise or remove it under lead-safe work practices. Oily residue in old light fittings Leaking PCB capacitors. Sampling.Isolate the fittings and remove the capacitors as hazardous waste.
What you see Likely cause, and what confirms it Next step Register shows large areas not accessed Incomplete survey. Register review.Survey those areas before any works; treat suspect materials there as asbestos until sampled.
What you see Likely cause, and what confirms it Next step Ladder marks on walls near plant No designed access to plant. Inspection.Install fixed access: a caged ladder, a ladder with fall arrest, or a platform with guardrails. Fixed ladder to plant with uneven rungs or no cage or fall arrest Ladder unsafe for regular use. Rung spacing and width measured against the asset’s market (Thresholds by market ).Repair or replace the ladder, and add fall protection or a stair where access is frequent. Roof edges or plant platforms with no guardrail Fall from height. Guardrail height and condition against the asset’s market (Thresholds by market ).Install guardrails or edge protection before further access.
What you see Likely cause, and what confirms it Next step Repeated slips at an entry Floor finish unsuitable when wet. Slip resistance test.Test the slip resistance; treat or replace the finish and add recessed matting. Falls on one stair Uneven risers or worn nosings. Measurement against the asset’s market (Thresholds by market ).Measure the risers and nosings; replace worn nosings and correct the flight. People walking into glass doors Missing manifestation. Inspection.Apply manifestation at the right heights, and check the glass is safety glass.
What you see Likely cause, and what confirms it Next step Contractors unaware of hazards No induction or registers. Records.Set up inductions, permits and registers, and make them available to contractors. No asbestos register, plant risk assessments or confined space register on site Contractors working without the information they need. Records review.Assemble the registers and include them in contractor induction.