Every sign of failure the Technical Library records under Environmental: 32 signs across 4 elements and spaces. Each row gives what you see, the likely cause and what confirms it, and the next step. Each heading opens the page the rows come from.
Scope
A sign usually has more than one possible cause. Each row names the likely one and what would confirm it; none is a diagnosis of a particular building, and none is a price.
What you see Likely cause, and what confirms it Next step Chargers trip when several vehicles charge Capacity exceeded or no load management. Load measurement; maximum demand.Measure maximum demand; add load management before more chargers, or upgrade the supply. Car park with no dedicated distribution board or spare capacity for charging Not ready for charging demand. Boards and capacity against the asset’s market (Thresholds by market ).Plan board and supply upgrades before chargers are requested.
What you see Likely cause, and what confirms it Next step Charger warm at terminals, faults recorded Poor terminations or undersized cabling. Thermography; inspection.Isolate the charger; remake the terminations and check the cabling and protection. Residents charging from general outlets with extension leads Lack of approved charging. Observation.Stop the practice now, and provide approved charging after a capacity check. Chargers mounted where vehicles strike them, or blocking escape routes Damage and egress risk. Layout review; impact protection; escape route widths.Relocate or protect the chargers with bollards or wheel stops.
What you see Likely cause, and what confirms it Next step Chargers offline and unusable Back-end or communications failure. Network status; vendor.Check the network and the vendor contract; prefer open-protocol chargers at replacement. Disputes over electricity costs Unmetered charging on common supply. Metering arrangement.Meter each charger or user, and set billing in the by-laws or lease. No metering of individual charging circuits Costs cannot be allocated. Metering arrangement against the asset’s market (Thresholds by market ).Fit sub-meters or networked chargers that record use per user.
What you see Likely cause, and what confirms it Next step No saving after a drive retrofit Drive bypassed or controls not changed. Drive status; trend data.Take the drive out of bypass and change the control sequence so it varies speed. Savings fading after recommissioning Overrides and drift. BMS overrides; trend data.Remove the overrides, restore schedules, and add fault detection so drift is caught early. Savings claimed but no measured before-and-after data Unverified result. Interval data across the change, adjusted for weather and occupancy.Set up measurement and verification for future projects.
What you see Likely cause, and what confirms it Next step Condensation after insulation upgrade No vapour control or ventilation. Inspection; humidity.Add vapour control and ventilation; treat mould now where it affects health. Heat pump building cold in winter Undersized heat pump or emitters. Heat loss vs output.Compare the heat loss with the heat pump and emitter output; resize or add capacity. Overheating after glazing film, insulation or air sealing Comfort traded for energy. Temperature logging; ventilation and shading.Add shading or ventilation; review the upgrade design.
What you see Likely cause, and what confirms it Next step Rating below the letting minimum Regulatory shortfall. Certificate.Plan the upgrades that reach the minimum by the regulatory date. Main switchboard near capacity before electrification Electrical capacity will limit heat pumps and chargers. Maximum demand against supply; for larger buildings, NCC J9D3 time-of-use meters on major services help size this (NCC J9D3 ).Model the electrified load and plan supply upgrades.
What you see Likely cause, and what confirms it Next step Sub-meters add up to much more or less than the main meter Ratio, polarity or mapping errors, or missing meters. Reconciliation; spot load checks.Reconcile against the main meter, then check ratios, polarity and mapping with spot load checks. Negative or reversed readings Current transformer installed backwards. Inspection.Reverse the current transformer and recommission the meter. Tenant consumption far from expected Wrong circuits measured. Load tracing.Trace the loads and correct the circuit allocation and mapping. Larger building with only one main electricity meter Metering below the market’s rules. Meters against the asset’s market (Thresholds by market ).Add meters at the next switchboard work.
What you see Likely cause, and what confirms it Next step Data flat for weeks Communications or battery failure. Gateway status.Restore communications or batteries, and set alarms for data gaps. Meters installed but nobody reviews the data Metering without use. Who receives reports and what action follows.Set up monthly review with exception alerts.
What you see Likely cause, and what confirms it Next step Billing disputes Mapping errors or unapproved meters. Audit.Audit the meters and mapping; correct past bills where errors are found. Tenants billed from estimates despite meters being fitted Meters unread or untrusted. Reading records; meter approvals.Verify the meters and move billing to actual readings.
What you see Likely cause, and what confirms it Next step Night flow with the building empty Leaks or timed urinals. Night flow test; isolate zones.Isolate zones to find the source; repair leaks and fit sensor urinal controls. Water use rising with no change in occupancy New leak. Sub-meters.Use the sub-meters to find the leak, then repair it and set leak alarms. Blockages after toilet replacement Low flows in old drains. CCTV; drain grades.Survey the drain by CCTV; upgrade it where low flows cannot carry waste. Toilets or urinals running constantly Failed fill valves or flush controls. Dye test in cisterns; urinal controls.Repair or replace the valves and fit urinal controls.
What you see Likely cause, and what confirms it Next step High cooling tower water use Poor bleed control. Treatment records.Control bleed by conductivity, with good water treatment. Constant flow from equipment Single-pass cooling. Inspection of kitchen and plant.Replace single-pass cooling with air-cooled or closed-loop equipment.
What you see Likely cause, and what confirms it Next step Summer peaks in water use Irrigation or cooling towers. Sub-meters; seasonal pattern.Use the sub-meters to separate irrigation from the cooling towers; fit smart controllers and rain sensors. Tanks full but mains use unchanged Harvesting system not supplying end uses. Pump and valve checks.Check the pumps and valves, and reconnect the system to its end uses.