Every sign of failure the Technical Library records under Façades: 87 signs across 9 elements and spaces. Each row gives what you see, the likely cause and what confirms it, and the next step. Each heading opens the page the rows come from.
Cornice top with vegetation and open joints, staining below
Missing weathering; water at the cramps. Aerial imagery; joints open on top.
Clear the vegetation; add lead or copper weatherings, and repoint the top joints in lime.
Fragments found on the pavement below a cornice or parapet
An unsafe façade condition. Hammer survey of the feature from access; in New York City, owners of buildings taller than six storeys must file a critical examination of the façades every five-year cycle, and unsafe conditions call for immediate public protection (FISP Cycle 10 notice).
Protect the pavement now, remove anything loose, and pin, rebuild or replace the units before the protection comes down.
Equipment cannot lawfully be used. Last inspection date against the required interval.
Take it out of use until inspected and certified, and restore the logbook.
Major inspection never done on a unit more than ten years old
Hidden structural condition unknown. Records; Australian guidance calls for a major inspection at that age.
Commission a major inspection before relying on the unit.
Corrosion at track fixings and leaks below them
Water at roof penetrations. Membrane condition at the fixings; leak log.
Refurbish the track and fixings, and renew the roof membrane at the penetrations.
Anchors without certification records
Anchors cannot be relied on. Certification records and intervals.
Take the anchors out of use; replace or recertify them.
Davit sockets or roof supports with no inspection in the last year
Support structure condition unknown. Inspection records for the supporting structure and the equipment, against the intervals for the asset’s market (Thresholds by market).
Inspect the supports and sockets before the next use, and set a yearly regime.
Connection rotation at the wall or general overload. All rods equally stretched; cracking along the wall line; added signage or water load.
Prop the awning; have an engineer assess the connections and loads.
Staining from the gutter line, deflection worst after rain
Blocked box gutter and ponding. Gutter full of debris; outlets undersized or blocked.
Clear the gutter; renew it with larger outlets and overflows.
Signage, plant or people now on an awning roof
Loads beyond what the awning was built for. Load check against the design actions: NSW structural engineers’ guidance applies 1.5 kPa with a 1.8 kN point load to awnings reachable from windows, roofs or balconies, and 1.0 kPa with 1.8 kN where access is only from the ground; older awnings were designed for as little as 0.25 kPa and 1.4 kN (Practice Note 18).
Remove the added load or keep people off; have an engineer check the awning for any load that must stay.
Staining and cracking below window corners on render or EIFS; damp at reveals inside
Water entry at window perimeter in a face-sealed system. No head or sill flashing; moisture readings high at the sill and bottom plate; decay found on opening up.
Probe the framing at the sills; reclad with a drained, ventilated system where the frame has decayed.
Rust staining from precast joints; cracking at panel corners
Corrosion of concealed fixings. Staining at fixing positions per the panel drawings; cracks radiating from corners; openings expose corroded ferrules or angles.
Open up at the fixing positions; add stainless anchors or replace corroded hangers.
Spalling in lines across precast faces
Reinforcement corrosion from low cover. Covermeter shows low cover along the line; carbonation depth reaches the steel, the front marking a fall in pH from about 12.5 to 8.5 (Institute of Corrosion).
Repair the concrete to a recognised repair standard, or overclad where the substrate is sound.
Dished or bowed stone panels, cracks at anchors
Thermal bowing of thin marble, or anchor failure. Bowing uniform across panels of the same stone: hysteresis; local cracking at one anchor: anchor corrosion or overstress.
Check the anchors; add supplementary stainless anchors, or replace bowed panels.
Layers of stone flaking parallel to the face
Face-bedded stone, or salt crystallisation. Bedding planes parallel to the face; salts in the debris.
Sandwich panel skins rusting from laps and cut edges, panels bulging
Cut-edge corrosion; wet or degraded core. Corrosion starts at edges and fixings; panel soft or delaminated when pressed.
Replace affected panels, or the system where the core is wet or degraded.
Peeling paint and decay concentrated at weatherboard ends and the bottom courses
End grain moisture and ground-line wetting. Ends unsealed; boards close to paving or soil; sound boards higher up. Clearances to ground, paving and floor framing measured against the asset’s market (Thresholds by market).
Replace decayed boards, seal the ends, restore ground clearance, and repaint.
Substrate joints in sheet or panel. Joint locations match.
Address the joints in the sheet or panel beneath before recoating.
Hollow, bulging render
Render debonded from masonry. Tapping; render lifts at the edges.
Cut out and replace the debonded render, or strip and re-render.
Rust staining through a coating on concrete
Reinforcement corrosion beneath. Cover survey; carbonation depth at the steel, the front marking a fall in pH from about 12.5 to 8.5, and chloride content where the threshold of 0.2 to 0.4 per cent by mass of cement may be exceeded (Institute of Corrosion).
Repair the concrete and treat the reinforcement, then apply an anti-carbonation coating.
Horizontal cracks at regular intervals, about every sixth course, outer leaf only
Wall tie corrosion. Worst on exposed elevations and higher up, where less load resists the lift; ties located by metal detector coincide with the cracks; inner face uncracked.
Survey the ties; install stainless remedial ties, removing or cutting back strip ties that are expanding.
Horizontal cracks in most bed joints, white swollen mortar, wall growth
Sulfate attack. Every course affected, not only tie courses; chimneys, parapets, rendered or wet walls; can affect both leaves; mortar soft when probed.
Confirm by mortar analysis, and get an engineer's advice on repair or rebuilding.
Horizontal crack and outward bow repeated at each floor line of a framed building
Frame shortening; no soft joint under the shelf angle. Repeats floor by floor; brick spalled at the angle; no sealant line, or crushed sealant, under the angle.
Form a soft joint under each shelf angle, and treat or replace the angles.
Stepped crack rising from a lintel end, horizontal crack along the lintel, brick lifted or dropped over the opening
Lintel corrosion. Rust at the bearing; crack widest at the lintel; opening frame itself square.
Prop the brickwork and replace the lintel, with a cavity tray, stop ends and weep holes.
Cracking and displacement along column and floor lines of an early steel-framed building
Rust jacking of embedded steel. Rust staining at the crack; corners and parapets first; brick pushed outward rather than dropped.
Open up, treat or replace the steel, and rebuild with flashing and drainage.
Diagonal crack tapering wider at top or bottom, through openings, continuing below the damp-proof course
Foundation movement. Crack passes through bricks in a continuous line; sticking doors, floor slopes, matching internal cracks; seasonal movement on reactive clay; nearby trees or leaking drains.
Address the cause and monitor; see Foundations.
Vertical crack of even width near a corner or at a short return; brickwork oversailing at the base
Clay brick expansion or thermal movement. Long run without movement joints; no distortion of openings; width does not change across seasons.
Saw-cut and seal a movement joint, and tie across where panels have been freed.
Vertical cracks at openings and mid-panel in blockwork or calcium silicate brick
Drying shrinkage. Material type; cracks widest early in life and then stable.
Repair once the cracks have stabilised; add movement joints where runs are long.
Adhesive failure: preparation, primer or contamination. New sealant needs full removal of old material, cleaning and priming; test adhesion before the programme.
Test adhesion at sample joints, then cut out and replace the joint completely.
Split down the middle, bonded both sides
Cohesive failure: over-extension or ageing. Check joint width against movement; if the joint is too narrow, a different sealant or joint design is needed.
Widen the joint, or change to a sealant suited to its movement.
Sealant intact, skin of substrate pulled off
Substrate failure. Lower-modulus sealant; substrate repair; possibly a bridge seal over the joint.
Repair the substrate, then fit a bridge seal or a lower-modulus sealant.
Torn across the back as well as split
Three-sided adhesion. Reinstate backing rod or bond breaker in the new joint.
Cut out and replace, with a backing rod or bond breaker.
Crack along the wall line on the top surface; tip of the slab lower than its root
Top reinforcement corrosion or overload in a cantilever. Half-cell and cover readings at the root; chloride or carbonation at bar depth; rotation measured by level.
Close the balcony until an engineer has assessed it; strengthen it, or replace it where section loss at the root is severe.
Spalling on the soffit and front edge
Corrosion of edge and bottom bars. Rust staining along bar lines; low cover.
Repair the concrete to a recognised repair standard.