The sign calls for investigation before works can be sized. These are the 111 findings the Technical Library grades as check, across 103 elements and spaces, each with what it means for timing. Each element’s name opens its own page, where the finding sits with its causes and remedies.
Scope
A grading describes a kind of finding in general. What a finding means in a particular building depends on that building’s own evidence, and the same sign can be graded differently once it is read. None of this is a diagnosis, and none of it is a price.
Finding Impact What it means for timing Walls without design approval; radon untested in affected areas 3 Important Assess.
Finding Impact What it means for timing Cracks of unknown cause; trees near a building on clay 3 Important Monitor for twelve months and investigate.
Finding Impact What it means for timing Slab capacity or flatness unknown for a new use 3 Important Survey and assess.
Finding Impact What it means for timing No timber pest inspection; inaccessible sub-floor 3 Important Inspect.
Finding Impact What it means for timing Alterations with no engineering on record 3 Important Assess.
Finding Impact What it means for timing Lateral system unknown; seismic adequacy unassessed in seismic regions 3 Important Assess.
Finding Impact What it means for timing Problem concretes possible; alterations unengineered; no survey of a car park 3 Important Assess.
Finding Impact What it means for timing Design loads unknown for current or proposed use 3 Important Assess capacity.
Finding Impact What it means for timing Heritage façade over a footpath with no close-up survey on record 2 Planned Close-up hammer survey before sizing works.
Finding Impact What it means for timing Unit more than ten years old with no major inspection; coverage of the current façade unknown 3 Important Major inspection and coverage study.
Finding Impact What it means for timing Tied awning more than ten years old with no engineer's certificate on record 2 Planned Structural inspection with opening up of anchorages.
Finding Impact What it means for timing Combustible cladding identified with no order yet 2 Planned External wall fire risk assessment by a fire engineer sets whether and how soon it must be remediated. Face-sealed system on framing of the at-risk era with no investigation on record 2 Planned Probe and open up before sizing works.
Finding Impact What it means for timing Pre-1970 paint layers with unknown lead content; coating on concrete with unknown carbonation depth 2 Planned Test before specifying works.
Finding Impact What it means for timing SSG with no adhesion test record; toughened glass at height with no heat-soak record; recurring leaks of unknown path 2 Planned Test before sizing works.
Finding Impact What it means for timing Tie-era cavity wall in exposed or marine position with no record of tie condition; cracks of unknown cause; damp of unknown source 2 Planned Investigate first; size the works from what the investigation finds.
Finding Impact What it means for timing Sealants on a building of the PCB era with no hazardous materials survey 2 Planned Test before any removal; sets the method of the programme.
Finding Impact What it means for timing Balustrades below current height or with climbable rails, compliant when built; monolithic toughened glass balustrades at height 3 Important Assess risk by use and fall height; upgrade where children use the space or where the risk warrants.
Finding Impact What it means for timing Working flue with no inspection record; appliance changed 2 Planned Inspect and test before use.
Finding Impact What it means for timing Insulation upgrade planned without a condensation risk assessment 2 Planned Assess the build-up before the work is specified. Possible vermiculite or spray foam with no records 2 Planned Identify and assess first.
Finding Impact What it means for timing Screens with no engineering; parapet used as roof edge protection with unknown height 2 Planned Assess.
Finding Impact What it means for timing Storm-only leaks of unknown cause; roof altered since design 3 Important Capacity check against current rainfall data before sizing works. Siphonic system with no maintenance records 3 Important Inspect outlets and verify the design before relying on it. Asbestos cement gutters or downpipes of unknown status 3 Important Identify before any work.
Finding Impact What it means for timing Sheet that may be asbestos cement, with no register entry 3 Important Identify by sampling before any work; it sets the method and the cost. Water entering at a point not yet found 3 Important Investigate before sizing works.
Finding Impact What it means for timing No system on a roof that needs maintenance access 3 Important Design the system to the work on the roof.
Finding Impact What it means for timing Fire-damaged members never assessed 3 Important Engineer's assessment before reliance. Plant or solar added with no engineering; RAAC possible from the building's era and type 3 Important Assess before sizing works.
Finding Impact What it means for timing Overhead glass of unknown type in an atrium 2 Planned Identify glass type.
Finding Impact What it means for timing Planted or paved roof with leaks and no access to the membrane 3 Important Locate the breach (electronic leak detection) before lifting the build-up. Leak history on a warm roof with no moisture survey 3 Important Survey before choosing repair, recover or replace. Pre-1990s bitumen felts and mastics of unknown status 3 Important Sample before cutting, coring or stripping.
Finding Impact What it means for timing Moisture readings elevated with no visible damage 3 Important Investigate further.
Finding Impact What it means for timing Services capacity unknown for the current menu 2 Planned Assess.
Finding Impact What it means for timing Grade, air, light and amenities never assessed against the market 2 Planned Assess fitness for purpose.
Finding Impact What it means for timing No fire door register; layout changes unreviewed 2 Planned Survey.
Finding Impact What it means for timing No capital works plan or door survey 2 Planned Prepare.
Finding Impact What it means for timing No capacity or fire stopping records 2 Planned Survey.
Finding Impact What it means for timing Service history unknown 3 Important Service and test.
Finding Impact What it means for timing Moisture or asbestos status unknown 2 Planned Test before works.
Finding Impact What it means for timing No integrated test since major changes 2 Planned Test.
Finding Impact What it means for timing No door schedule or interface test 2 Planned Survey.
Finding Impact What it means for timing No review of locking and re-entry 2 Planned Assess.
Finding Impact What it means for timing Hazardous content unknown in older finishes 2 Planned Sample before works.
Finding Impact What it means for timing Gas and electrical compliance unknown 2 Planned Inspect.
Finding Impact What it means for timing Machine room conditions unknown 3 Important Assess.
Finding Impact What it means for timing No traffic management plan or capacity review 2 Planned Assess.
Finding Impact What it means for timing Glass types and smoke design unknown 2 Planned Assess.
Finding Impact What it means for timing No access audit; door safety unchecked 2 Planned Assess.
Finding Impact What it means for timing No access audit 2 Planned Audit.
Finding Impact What it means for timing Rated partitions not identified 2 Planned Survey.
Finding Impact What it means for timing Plant room conditions never assessed 2 Planned Assess.
Finding Impact What it means for timing Occupancy against fixtures unknown 2 Planned Assess.
Finding Impact What it means for timing No unit sample inspected 2 Planned Inspect.
Finding Impact What it means for timing Services capacity per tenancy unknown 2 Planned Survey.
Finding Impact What it means for timing Egress role of corridors not documented 2 Planned Review.
Finding Impact What it means for timing Use changed without a review of services 2 Planned Assess.
Finding Impact What it means for timing Feature undocumented 2 Planned Record and assess.
Finding Impact What it means for timing Storage loads and contents unknown 2 Planned Survey.
Finding Impact What it means for timing Unapproved structures; no engineering 2 Planned Assess.
Finding Impact What it means for timing No gate safety test records; signage not reviewed after changes 2 Planned Inspect.
Finding Impact What it means for timing No tree risk assessment 2 Planned Assess.
Finding Impact What it means for timing Pavement capacity for current traffic unknown 2 Planned Assess.
Finding Impact What it means for timing No inspection records 2 Planned Inspect.
Finding Impact What it means for timing No drawings; detention obligations unknown 3 Important Investigate.
Finding Impact What it means for timing No hygiene inspection; outside air not measured 2 Planned Inspect and measure.
Finding Impact What it means for timing No documentation or security assessment 2 Planned Audit.
Finding Impact What it means for timing No tube testing, oil analysis or load study on record; capacity questioned after tenancy changes 2 Planned Plant condition and load assessment before sizing works.
Finding Impact What it means for timing No water treatment records; no assessment of heat pump readiness 2 Planned Assess before replacing.
Finding Impact What it means for timing No hygiene inspection; fire damper register incomplete 2 Planned Inspect.
Finding Impact What it means for timing Condenser capacity in doubt on hot days 2 Planned Assess.
Finding Impact What it means for timing Refrigerant type unknown; VRF compliance unknown 2 Planned Inspect.
Finding Impact What it means for timing No sample inspection; controls data unavailable 2 Planned Sample inspection and controls audit.
Finding Impact What it means for timing No records for safety-related systems 2 Planned Test and inspect.
Finding Impact What it means for timing Line types unknown; no security assessment 2 Planned Audit.
Finding Impact What it means for timing No test records; layout not checked after fit-outs 3 Important Test every fitting and review coverage.
Finding Impact What it means for timing No load bank test or load study 3 Important Test and study.
Finding Impact What it means for timing No column testing; PCB status unknown; no lux survey 2 Planned Inspect and survey.
Finding Impact What it means for timing No documentation; energy data not reviewed 2 Planned Audit.
Finding Impact What it means for timing No risk assessment; ESE system; no records 3 Important Assess.
Finding Impact What it means for timing Capacity unknown for electrification or EV charging; no recent thermography 2 Planned Assess.
Finding Impact What it means for timing No periodic inspection on record; wiring type unknown 3 Important Inspect and test.
Finding Impact What it means for timing Roof structure not assessed; PPA terms unknown 2 Planned Assess.
Finding Impact What it means for timing No design certificate; use changed; no recent flow test 3 Important Design review and testing.
Finding Impact What it means for timing No interface test on record; system not reviewed after fit-outs 3 Important Audit and full integrated test.
Finding Impact What it means for timing No flow test record; town main pressure not checked recently 3 Important Flow test and supply check.
Finding Impact What it means for timing No flow test on record 3 Important Flow test.
Finding Impact What it means for timing No fire strategy; compartmentation unknown 3 Important Fire strategy and compartmentation survey.
Finding Impact What it means for timing No register; placement not reviewed after fit-outs 3 Important Survey.
Finding Impact What it means for timing No integrated test since changes 3 Important Integrated test.
Finding Impact What it means for timing Design basis unknown after change of use 3 Important Review.
Finding Impact What it means for timing Installation never tested; alterations unrecorded 3 Important Tightness test and inspection.
Finding Impact What it means for timing No risk assessment or temperature records 2 Planned Assess.
Finding Impact What it means for timing No backup power or alarm monitoring; capacity unknown 2 Planned Assess.
Finding Impact What it means for timing No CCTV; repeated blockages of unknown cause 3 Important Survey.
Finding Impact What it means for timing No water management plan; no barrier certificate 2 Planned Assess.
Finding Impact What it means for timing No trade waste agreement; capacity not checked after tenancy changes 2 Planned Assess.
Finding Impact What it means for timing Pipe materials unknown; no backflow register 3 Important Survey.
Finding Impact What it means for timing No access audit; no evacuation arrangement for users 3 Important Assess with an access consultant and the fire strategy.
Finding Impact What it means for timing Forklift weights unknown; vehicle movements unknown; asbestos status unknown 3 Important Establish before sizing works.
Finding Impact What it means for timing No audit, no injury analysis, duty unknown, asbestos status unknown 3 Important Audit before sizing works.
Finding Impact What it means for timing No condition audit; modernisation history unknown; asbestos status unknown 3 Important Audit before sizing works.
Finding Impact What it means for timing No access audit; alterations planned 2 Planned Audit.
Finding Impact What it means for timing Areas not accessed; refurbishment planned 3 Important Survey before works.
Finding Impact What it means for timing No registers or building safety file 3 Important Compile.
Finding Impact What it means for timing No capacity study; tenant or resident demand rising 2 Planned Assess capacity.
Finding Impact What it means for timing No audit; ratings unknown 2 Planned Audit.
Finding Impact What it means for timing No reconciliation or metering schedule 2 Planned Audit.
Finding Impact What it means for timing No water audit 2 Planned Audit.