Every measured value the Technical Library records for the United Kingdom: 83 thresholds across 55 elements and spaces, each with the code or standard it comes from. Each element’s name opens its own page, where the value sits with how the element fails and what fixes it.
Substructure
Foundations
| Measure | Threshold | Source |
|---|---|---|
| Damage categories (BRE Digest 251) | Category 0 under 0.1 mm; 1 up to 1 mm; 2 up to 5 mm; 3 from 5 to 15 mm; 4 from 15 to 25 mm; 5 above 25 mm | BRE Digest 251 Assessment of damage in low-rise buildings (revised 1995) |
Superstructure
Structural Frame
| Measure | Threshold | Source |
|---|---|---|
| Deflection (Eurocode 2 and former British practice) | Sag beyond span/250 impairs appearance; after partitions, deflection may be limited to span/500; brittle finishes damaged at L/500 or 20 mm, whichever is less | Deflection and preliminary vibration effects on structural elements (The Structural Engineer, 89(5), 2011) (quoted by a secondary source) |
Upper Floor Slabs & Structures
| Measure | Threshold | Source |
|---|---|---|
| Deflection (Eurocode 2 and former British practice) | Sag beyond span/250 impairs appearance; after partitions, deflection may be limited to span/500; brittle finishes damaged at L/500 or 20 mm, whichever is less | Deflection and preliminary vibration effects on structural elements (The Structural Engineer, 89(5), 2011) (quoted by a secondary source) |
Façades
Cladding & Wall Systems
| Measure | Threshold | Source |
|---|---|---|
| External wall surfaces, residential buildings (England) | Class A2-s1, d0 or better where a storey is more than 11 m above ground | Approved Document B, Volume 1: Dwellings (2026 online version), Table 10.1 |
Glazing Systems
| Measure | Threshold | Source |
|---|---|---|
| Critical locations for glazing (England) | Below 800 mm in windows; up to 1500 mm in doors and in side panels within 300 mm of a door | Approved Document K (2013 edition incorporating 2016 and 2020 amendments) |
Masonry/Brickwork
| Measure | Threshold | Source |
|---|---|---|
| Damage categories (BRE Digest 251) | Category 0 under 0.1 mm; 1 up to 1 mm; 2 up to 5 mm; 3 from 5 to 15 mm; 4 from 15 to 25 mm; 5 above 25 mm | BRE Digest 251 Assessment of damage in low-rise buildings (revised 1995) |
Verandahs, Balconies & Balustrades
| Measure | Threshold | Source |
|---|---|---|
| Balcony guarding (England) | At least 1100 mm high; no openings that pass a 100 mm sphere | Approved Document K (2013 edition incorporating 2016 and 2020 amendments) |
Roofs & Rainwater Goods
Chimney Stacks & Flues
| Measure | Threshold | Source |
|---|---|---|
| Kitchen extract grease (TR19 Grease) | Deposits of no more than 200 microns; cleaning every 3, 6 or 12 months for heavy, moderate or light use | Ventilation hygiene standards (TR19) |
Plant Screens & Parapets
| Measure | Threshold | Source |
|---|---|---|
| Roof edge guarding (England) | At least 1100 mm high | Approved Document K (2013 edition incorporating 2016 and 2020 amendments) |
Roof Safety Systems
| Measure | Threshold | Source |
|---|---|---|
| Roof edge guarding (England) | At least 1100 mm high | Approved Document K (2013 edition incorporating 2016 and 2020 amendments) |
Waterproofing Membranes
| Measure | Threshold | Source |
|---|---|---|
| Minimum finished fall, flat roofs | 1 in 80 (12.5 mm per metre) | BS 6229:2025 Flat roofs with continuously supported flexible waterproof coverings |
Internal Areas
Bathrooms & Wet Areas
| Measure | Threshold | Source |
|---|---|---|
| Bathroom extract (England, dwellings) | At least 15 L/s run intermittently, or 8 L/s on a continuous system’s high rate | Approved Document F, Volume 1: Dwellings (2021 edition), Table 1.1 and 1.2 |
| Hot water temperatures (Legionella control) | Stored at 60 °C or more; 50 °C at outlets within one minute (55 °C in healthcare) | HSG274 Legionnaires’ disease: Technical guidance, Part 2: Hot and cold water systems |
Commercial Kitchens
| Measure | Threshold | Source |
|---|---|---|
| Hot water temperatures (Legionella control) | Stored at 60 °C or more; 50 °C at outlets within one minute (55 °C in healthcare) | HSG274 Legionnaires’ disease: Technical guidance, Part 2: Hot and cold water systems |
| Grease in kitchen extract ductwork (TR19 Grease) | Deposits of no more than 200 microns | Ventilation hygiene standards (TR19) |
Commercial Office Areas (Base-Build)
| Measure | Threshold | Source |
|---|---|---|
| Outside air, offices (England) | 10 L/s per person | Approved Document F, Volume 2: Buildings other than dwellings |
| Carbon dioxide in occupied spaces | Below 800 ppm suggests good ventilation; consistently above 1500 ppm calls for action | Approved Document F, Volume 2: Buildings other than dwellings |
| Lighting at desks | Average 200 lux, with no point below 100 lux | Lighting at work (HSG38) |
| Workroom temperature | Usually at least 16 °C | Temperature in the workplace: managing |
Common Circulation Areas
| Measure | Threshold | Source |
|---|---|---|
| Fire door gaps (England) | No more than 4 mm, except at the bottom | Fire Safety (England) Regulations 2022: fire door guidance |
| Fire door checks (England, storey over 11 m) | Communal fire doors at least every 3 months; flat entrance doors every 12 months | Fire Safety (England) Regulations 2022: fire door guidance |
| Corridor smoke vent free area (England) | At least 1.5 m² on an external wall, or 1 m² into a smoke shaft | Approved Document B, Volume 1: Dwellings (2026 online version) |
Common Internal Areas
| Measure | Threshold | Source |
|---|---|---|
| Fire door gaps (England) | No more than 4 mm, except at the bottom | Fire Safety (England) Regulations 2022: fire door guidance |
| Fire door checks (England, storey over 11 m) | Communal fire doors at least every 3 months; flat entrance doors every 12 months | Fire Safety (England) Regulations 2022: fire door guidance |
Electrical & Communications Risers
| Measure | Threshold | Source |
|---|---|---|
| Fire door gaps (England) | No more than 4 mm, except at the bottom | Fire Safety (England) Regulations 2022: fire door guidance |
Flooring
| Measure | Threshold | Source |
|---|---|---|
| Separating floors in flats (England) | New build: airborne at least 45 dB, impact no more than 62 dB; conversions: 43 dB and 64 dB | Approved Document E (2003 edition incorporating 2004, 2010, 2013 and 2015 amendments), Table 1.1 |
Integrated Building Systems
| Measure | Threshold | Source |
|---|---|---|
| Alarm level in sleeping rooms | 75 dB(A) at the bedhead | Fire safety risk assessment: sleeping accommodation |
Internal Doors & Hardware
| Measure | Threshold | Source |
|---|---|---|
| Fire door gaps (England) | No more than 4 mm, except at the bottom | Fire Safety (England) Regulations 2022: fire door guidance |
| Opening force at the leading edge (England) | No more than 30 N from closed to 30° open, and 22.5 N from 30° to 60° | Approved Document M, Volume 2: Buildings other than dwellings (with 2024 amendments) |
Internal Stairwells
| Measure | Threshold | Source |
|---|---|---|
| Rise and going, general access stairs (England) | Rises 150 to 170 mm and goings 250 to 400 mm | Approved Document K (2013 edition incorporating 2016 and 2020 amendments) |
| Handrail height (England) | 900 to 1000 mm above the pitch line | Approved Document K (2013 edition incorporating 2016 and 2020 amendments) |
| Fire door gaps (England) | No more than 4 mm, except at the bottom | Fire Safety (England) Regulations 2022: fire door guidance |
Kitchen
| Measure | Threshold | Source |
|---|---|---|
| Kitchen extract (England, dwellings) | At least 30 L/s through a cooker hood ducted outside, 60 L/s from a fan elsewhere, or 13 L/s on a continuous system’s high rate | Approved Document F, Volume 1: Dwellings (2021 edition), Table 1.1 and 1.2 |
Lift Cars & Machine Rooms
| Measure | Threshold | Source |
|---|---|---|
| Passenger lift car size (England, new lifts) | At least 1100 mm wide and 1400 mm deep | Approved Document M, Volume 2: Buildings other than dwellings (with 2024 amendments) |
| Thorough examination of lifts | At least every 6 months for equipment that lifts people | Thorough examination of lifting equipment (INDG422) |
Lobbies & Atria
| Measure | Threshold | Source |
|---|---|---|
| Guarding (England) | At least 1100 mm high; no openings that pass a 100 mm sphere | Approved Document K (2013 edition incorporating 2016 and 2020 amendments) |
| Circulation routes | Average 20 lux, with no point below 5 lux | Lighting at work (HSG38) |
Main Entrance & Reception Areas
| Measure | Threshold | Source |
|---|---|---|
| Opening force at the leading edge (England) | No more than 30 N from 0 to 30 degrees, and 22.5 N from 30 to 60 degrees | Approved Document M, Volume 2: Buildings other than dwellings (with 2024 amendments) |
Maintenance Access Areas
| Measure | Threshold | Source |
|---|---|---|
| Guarding at edges (England) | At least 1100 mm high | Approved Document K (2013 edition incorporating 2016 and 2020 amendments) |
Partitioning Systems
| Measure | Threshold | Source |
|---|---|---|
| Separating walls between dwellings (England) | Airborne sound insulation at least 45 dB for purpose-built flats and houses; 43 dB in conversions | Approved Document E (2003 edition incorporating 2004, 2010, 2013 and 2015 amendments), Table 1a |
| Manifestation on glazed screens and doors (England) | At two levels: 850 mm to 1000 mm and 1400 mm to 1600 mm; logos at least 150 mm high, or bands at least 50 mm high | Approved Document K (2013 edition incorporating 2016 and 2020 amendments), 7.4 |
Public Amenities
| Measure | Threshold | Source |
|---|---|---|
| Hot water temperatures (Legionella control) | Stored at 60 °C or more; 50 °C at outlets within one minute (55 °C in healthcare) | HSG274 Legionnaires’ disease: Technical guidance, Part 2: Hot and cold water systems |
| Infrequently used outlets | Flushed at least every 7 days, or as the risk assessment sets | HSG274 Legionnaires’ disease: Technical guidance, Part 2: Hot and cold water systems |
Residential Units/Guest Rooms
| Measure | Threshold | Source |
|---|---|---|
| Alarm level in sleeping rooms | 75 dB(A) at the bedhead | Fire safety risk assessment: sleeping accommodation |
| Bathroom extract (England, dwellings) | At least 15 L/s run intermittently, or 8 L/s on a continuous system’s high rate | Approved Document F, Volume 1: Dwellings (2021 edition) |
| Separating floors in flats (England) | New build: airborne at least 45 dB, impact no more than 62 dB; conversions: 43 dB and 64 dB | Approved Document E (2003 edition incorporating 2004, 2010, 2013 and 2015 amendments), Table 1.1 |
Retail Tenancies (Base-Build)
| Measure | Threshold | Source |
|---|---|---|
| Kitchen extract grease (TR19 Grease) | Deposits of no more than 200 microns | Ventilation hygiene standards (TR19) |
| Foul drain gradients (England) | 100 mm drain serving at least one WC: 1:80 or steeper; 150 mm drain serving at least five: 1:150; 75 mm or 100 mm drains with peak flow below 1 L/s: 1:40 | Approved Document H: Drainage and waste disposal (2015 edition), Table 6 |
Service Corridors
| Measure | Threshold | Source |
|---|---|---|
| Corridors and circulation routes | Average 20 lux, with no point below 5 lux | Lighting at work (HSG38) |
External Elements
Stormwater Drainage
| Measure | Threshold | Source |
|---|---|---|
| Rainwater drain gradients (England) | 75 mm and 100 mm drains no flatter than 1:100; 150 mm at 1:150; 225 mm at 1:225 | Approved Document H: Drainage and waste disposal (2015 edition), paragraph 3.15 |
Mechanical Services
Air Handling Units (AHUs)
| Measure | Threshold | Source |
|---|---|---|
| Outside air, offices (England) | 10 L/s per person | Approved Document F, Volume 2: Buildings other than dwellings |
| Carbon dioxide in occupied spaces | Below 800 ppm suggests good ventilation; consistently above 1500 ppm calls for action | Approved Document F, Volume 2: Buildings other than dwellings |
Ductwork & Air Distribution
| Measure | Threshold | Source |
|---|---|---|
| Kitchen extract grease (TR19 Grease) | Deposits of no more than 200 microns | Ventilation hygiene standards (TR19) |
Heat Rejection Plant
| Measure | Threshold | Source |
|---|---|---|
| Cooling tower general aerobic count | Under control up to 10,000 cfu/ml; corrective action above 100,000 cfu/ml | HSG274 Legionnaires’ disease: Technical guidance, Part 1: Evaporative cooling systems |
| Cooling tower Legionella | Review above 100 cfu/litre; immediate action above 1,000 cfu/litre | HSG274 Legionnaires’ disease: Technical guidance, Part 1: Evaporative cooling systems |
Terminal Units
| Measure | Threshold | Source |
|---|---|---|
| Outside air, offices (England) | 10 L/s per person | Approved Document F, Volume 2: Buildings other than dwellings |
| Carbon dioxide in occupied spaces | Below 800 ppm suggests good ventilation; consistently above 1500 ppm calls for action | Approved Document F, Volume 2: Buildings other than dwellings |
Ventilation Systems
| Measure | Threshold | Source |
|---|---|---|
| Kitchen extract grease (TR19 Grease) | Deposits of no more than 200 microns | Ventilation hygiene standards (TR19) |
Electrical Services
Emergency Lighting
| Measure | Threshold | Source |
|---|---|---|
| Rated duration | Designed for 1 to 3 hours, most often 3 hours where premises may be re-occupied straight after a failure | Fire safety risk assessment: offices and shops |
Emergency Power
| Measure | Threshold | Source |
|---|---|---|
| Routine generator runs | Standby diesel engines run for 30 minutes each week | Fire safety risk assessment: offices and shops |
Lighting
| Measure | Threshold | Source |
|---|---|---|
| Corridors and circulation routes | Average 20 lux, with no point below 5 lux | Lighting at work (HSG38) |
| Offices and fine work | Offices: average 200 lux, minimum 100 lux; fine work: average 500 lux, minimum 200 lux | Lighting at work (HSG38) |
Lightning Protection
| Measure | Threshold | Source |
|---|---|---|
| Rolling sphere radius by protection level (BS EN 62305) | 20 m, 30 m, 45 m and 60 m for levels I to IV | BS EN 62305-1:2011 Protection against lightning: General principles |
Fire Services
Automatic Sprinkler Systems
| Measure | Threshold | Source |
|---|---|---|
| When sprinklers are required (England) | New residential buildings with a storey more than 11 m above ground, since 2020 | Approved Document B: Fire safety, volumes 1 and 2 |
Fire Detection & Alarm Systems
| Measure | Threshold | Source |
|---|---|---|
| Alarm level in sleeping rooms | 75 dB(A) at the bedhead | Fire safety risk assessment: sleeping accommodation |
Hydrant & Hose Reel Systems
| Measure | Threshold | Source |
|---|---|---|
| Fire service access to dry main inlets (England) | A pumping appliance within 18 m of each inlet, with the inlet visible from where it parks | Approved Document B, Volume 2: Buildings other than dwellings (2026 online version) |
Passive Fire Protection
| Measure | Threshold | Source |
|---|---|---|
| Fire door gaps (England) | No more than 4 mm, except at the bottom | Fire Safety (England) Regulations 2022: fire door guidance |
| Fire door checks (England, storey over 11 m) | Communal fire doors at least every 3 months; flat entrance doors at least every 12 months | Fire Safety (England) Regulations 2022: fire door guidance |
Portable Fire Equipment
| Measure | Threshold | Source |
|---|---|---|
| Travel distance to an extinguisher | No more than 30 m | Fire safety risk assessment: offices and shops |
| Handle height | About 1 m for larger extinguishers and 1.5 m for smaller ones | Fire safety risk assessment: offices and shops |
Smoke Management Systems
| Measure | Threshold | Source |
|---|---|---|
| Smoke vents and shafts (England) | Corridor or lobby vent on an external wall: free area at least 1.5 m²; smoke shaft: section at least 1.5 m², with vents of at least 1 m² | Approved Document B, Volume 1: Dwellings (2026 online version) |
| Smoke shaft outlet (England) | At least 0.5 m above surrounding structures within 2 m, and at least 2.5 m above the ceiling of the highest storey served | Approved Document B, Volume 1: Dwellings (2026 online version) |
Hydraulic Services
Hot & Warm Water Plant
| Measure | Threshold | Source |
|---|---|---|
| Hot water temperatures (Legionella control) | Stored at 60 °C or more; 50 °C at outlets within one minute (55 °C in healthcare); return to the calorifier no less than 50 °C | HSG274 Legionnaires’ disease: Technical guidance, Part 2: Hot and cold water systems |
Sanitary & Drainage Systems
| Measure | Threshold | Source |
|---|---|---|
| Foul drain gradients (England) | 100 mm drain serving at least one WC: 1:80 or steeper; 150 mm drain serving at least five: 1:150; 75 mm or 100 mm drains with peak flow below 1 L/s: 1:40 | Approved Document H: Drainage and waste disposal (2015 edition), Table 6 |
Vertical Transportation
Accessibility Lifts
| Measure | Threshold | Source |
|---|---|---|
| Lifting platform speed (England) | Rated speed no more than 0.15 m/s | Approved Document M, Volume 2: Buildings other than dwellings (with 2024 amendments) |
| Thorough examination (lifting equipment) | At least every 6 months for equipment that lifts people; every 12 months for other lifting equipment, unless an examination scheme sets otherwise | Thorough examination of lifting equipment (INDG422) |
Dock Levellers & Goods Hoists
| Measure | Threshold | Source |
|---|---|---|
| Thorough examination (lifting equipment) | At least every 6 months for equipment that lifts people; every 12 months for other lifting equipment, unless an examination scheme sets otherwise | Thorough examination of lifting equipment (INDG422) |
Escalators & Moving Walks
| Measure | Threshold | Source |
|---|---|---|
| Step-to-skirt gap (BS EN 115) | No more than 4 mm on either side of a step; 7 mm in total across both sides | Innovative technologies that improve escalator passenger safety (Symposium on Lift and Escalator Technologies) (quoted by a secondary source) |
| Rated speed at a 30° incline (BS EN 115-1) | Up to 0.75 m/s | Innovative technologies that improve escalator passenger safety (Symposium on Lift and Escalator Technologies) (quoted by a secondary source) |
Passenger & Goods Lifts
| Measure | Threshold | Source |
|---|---|---|
| Passenger lift car size (England, new lifts) | At least 1100 mm wide and 1400 mm deep | Approved Document M, Volume 2: Buildings other than dwellings (with 2024 amendments) |
| Thorough examination (lifting equipment) | At least every 6 months for equipment that lifts people; every 12 months for other lifting equipment, unless an examination scheme sets otherwise | Thorough examination of lifting equipment (INDG422) |
Building Code Compliance
Disabled Access (DDA)
| Measure | Threshold | Source |
|---|---|---|
| Opening force at the leading edge (England) | No more than 30 N from 0 to 30 degrees, and 22.5 N from 30 to 60 degrees | Approved Document M, Volume 2: Buildings other than dwellings (with 2024 amendments) |
Occupational Health & Safety (OHS)
| Measure | Threshold | Source |
|---|---|---|
| Guarding at edges (England) | At least 1100 mm high | Approved Document K (2013 edition incorporating 2016 and 2020 amendments) |
Nothing matches that. Try fewer letters.